918-477-1425 Resume of Richard
Michael Wilson PMP WORK
EXPERIENCE
Linde Process Plants
Industrial – EPC, Natural Gas Plants (Aug’2012 – present) Position: Manager
of Project Controls Primary Duties: “Hands-on”
manager involved in preparation, review, and final approval of project
schedules, earned value management, cost forecasts, cost analysis, cost
estimates, change management, risk reviews, and execution strategy
development for major domestic and international projects. Manage a
control staff of 14 employees in North America. Secondary Duties: Support the
Project Development Department in preparing proposal schedules and estimates
for project ranging from $100-$300 million with $600 million in order intake
per year. For the last year my focus has been to build a staff of entry
level scheduler and cost controllers, develop and philosophy for executing
project controls on existing projects, work with Linde headquarters on
designing a control department (integrate P6, SAP, and Cost Mgt. system) for
the future, and training our LPP Sr. Mgt., Mgt., and Leads in all areas of
our EPC to understand the basic concepts of control work. Intimately
engaged in all current projects and proposals. Spend a great deal
of time leading an effort to better manage/estimate change orders on existing
projects. Experienced in industrial estimates including estimating equipment,
material and installation costs for all cost categories / divisions
including; site prep, pilings, undergrounds, foundations, equipment,
instrumentation, support and platform steel, buildings, piping, ductwork,
electrical, insulation, painting, demolition, and general field costs,
etc. As well as provide engineering, equipment procurement, process and
pipe-rack module fabrication and assembly, off module fabrication, and construction
“execution strategies” and “constructability analysis” input on all
projects. Post Project
Secondary Duties:
Claims prevention and support, relating to home office and construction
production loss, delays, scope changes, subcontractor breaches, subcontractor
extras, etc. Experience in working with the legal department on
liquidated damage claim defense. Abeinsa EPC (subsidiary of Abengoa), Previously
MECS – (subsidiary of Monsanto) Industrial
– EPC, In Solar and Biomass Ethanol ( Sep 1997 - Aug
2012
)
St. Louis, MO Positions:
Manager of Project Controls / Project Director/Manager / Project
Engineer / Estimator Primary Duties: “Hands-on”
manager involved in all phases of project controls. My last project as the
Projects Controls Mgr. included a design/build 280mw Solar Power plant
(Solana, Az / $2.4 billion), and another similar 280mw solar plant (Mojave Ca
/ $1.8 billion). In addition to managing the control staff
Schedulers, Earned Value Specialist, and Cost Engineers that peaked. Other
non-project related responsibilities include developing standards,
procedures, training staff, and overall guidance for all Project Control
group activities. My last assignment
was Project Co-Director of a biomass ethanol project (Kansas, $550
million). This project had a
staff of over 300 indirect employees and 26 subcontractors. Previous Projects
and Duties:
Project Control Engineer at several experience levels. Assigned to all
large active projects. Involved from the conceptual phase through mechanical
completion. Projects have included relocation to field assignments
during construction in various areas of the US & Mexico. Field
duties included planning and scheduling, installed quantity verification,
progress reporting, cost reporting, installation cost forecasting,
productivity/manpower level analysis, risk analysis, and special projects
including field supervision and support of subcontractors when
required. Most projects included turnarounds and shutdown planning for
tie-in work. Bulk of basic project experience gained was at this level.
TIMEC Construction
Company ( Jan 1996 - Sep 1997
)
Vallejo,
Ca.
Position:
Project Control Consultant Assigned solely to the
Tosco Avon Refinery as a third party consultant to assist Tosco with their
emergency shutdown planning, turnaround planning, maintenance personnel and
systems restructuring, and refinery budget planning. Worked directly
with the plant manager and the project manager’s to assist them in stream
lining their approach to project work. Trained the project managers,
maintenance supervisors, and maintenance planners in Microsoft Project
software. Hill/Phibro/Basis/Valero
Refinery (Sep 1990 – Jan 1996
)
Texas City,
Tx.
Positions:
Maintenance Supervisor - Project Turnaround Planner – Maintenance
Planner Functioned as a
Maintenance Planner initially, assuming duties scheduling daily maintenance
work in the plant, promoted to Maintenance Supervisor, which included
supervising all after hours maintenance work in the plant. Supervisor a
second shift for 1.5 years. The crew included a mix of all crafts (Boilermaker,
Pipefitter, Machinist, Electricians, Instrument Tech’s, Carpenter’s, Heavy
Equipment Operators, Labor’s, etc.). Promoted to Corporate Turnaround
Planner for all three Phibro refineries. Extensive experience in
emergency maintenance scheduling, turnaround planning, plant budgeting, and
supervising craft crews. Performed all CPM work using Open Plan
software. Nooter
(union) / Wyatt (non-union) Construction (1982 – 1990) St Louis, Mo./
Houston,
Tx.
Positions:
Turnaround Planner / Boilermaker Began as a Boilermaker
between semesters of college (4000 union, 2500 non-union man-hours). In
1985 began work as a Turnaround Planner/Scheduler using Kurtz and Steel CPM
software. Planned and scheduled around the clock work with crews reaching
up to 400 workers per shift on major refinery (Sun Oil, Texaco, Mobil, etc)
and chemical plant turnaround projects. Education and
Certifications MISSOURI
STATE
UNIVERSITY
Springfield, Mo. -
Bachelor
of Science, Industrial Management (1992), emphasis in Construction &
Drafting PMI
(Project Management Institute) organization -
PMP -
Project Management Professional Member
of AACE International (Association for the Advancement of Cost Engineers). SYSTEMs EXPERIENCE,
Capabilities, ETC. Primavera Project Planning
Systems. practical application knowledge of P6/SAP/Ecosys (not user),
extensive user knowledge in P3, Suretrak, MS Project, MS Word, and MS
Excel, Icarus estimating software. Extensive work
sequencing experience with engineering, procurement, fabrication and
construction aspects of industrial work. Knowledgeable and experienced in all
phases of project execution including; scope development, estimating, basic
and detailed engineering, contract administration, project management,
project engineering, procurement, expediting, shipping, heavy lift planning,
equipment requirements, freight coordination, cost accounting, financial
reporting, construction change management, union work rules, union work
assignments, turnaround planning, and commissioning / start-up planning. detailS of Past
Recent project Experience:
Dates
Positions Client / Company Location
Description
Size (mm)
detailS of Past
Major project Experience:
Approximate
Dates
Positions Client / Company
Location Description
Size (mm)
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|